Rea Valley Light Railway
10 - Construction of No. 13 "MALVERN" from a Locolines’ “Jumbo” kit
11th August 2007

Stages in the construction of 0-6-0T No.13 MALVERN, a battery powered loco constructed from card & wood.

The model was adapted from the LOCOLINES' "Jumbo" card loco kit and the chassis is the 0-6-0 deluxe model from I P ENGINEERING. Some of the detailing was supplied by CAMBRIAN MODELS who produce a wide range of items for 16mm:1ft scale model narrow gauge railways. (Links correct at 10 May 2008.)

Please note that I have no connection with Locolines, I P Engineering or Cambrian Models apart from being a very satisfied customer.


<-- Index | Showing 1-21 of 21 pictures | Index -->
After varnishing the Locolines' printed sheets the cab back and rear sides are cut in half
After varnishing the Locolines' printed sheets the cab back and rear sides are cut in half
769x446
The cab back and rear sides cut in half - This prepares these parts for making the coal bunker
The cab back and rear sides cut in half - This prepares these parts for making the coal bunker
813x488
This side view shows how the coal bunker has been formed from the modified parts - 31 July 2007
This side view shows how the coal bunker has been formed from the modified parts - 31 July 2007
1518x1239
To get some idea of size the half finished loco is seen here with other stock from the RVLR - 31 July 2007
To get some idea of size the half finished loco is seen here with other stock from the RVLR - 31 July 2007
2608x1980
Instead of producing separate tanks with the boiler in between the tanks are made up into one large box - In this picture the smokebox has been fitted - 2 August 2007
Instead of producing separate tanks with the boiler in between the tanks are made up into one large box - In this picture the smokebox has been fitted - 2 August 2007
2288x1820
The detailing added to the removable tanks and boiler top - 7 August 2007
The detailing added to the removable tanks and boiler top - 7 August 2007
1720x1376
The  tanks and boiler top seen here fitted to the loco - 7 August 2007
The tanks and boiler top seen here fitted to the loco - 7 August 2007
2135x1420
Inside the space created sits the batteries and smoke unit - Switches have been fitted inside to allow different settings for the smoke unit and motor - 7 August 2007
Inside the space created sits the batteries and smoke unit - Switches have been fitted inside to allow different settings for the smoke unit and motor - 7 August 2007
2832x2128
The sound unit is a tight fit inside the over-sized backhead - 7 August 2007
The sound unit is a tight fit inside the over-sized backhead - 7 August 2007
2832x2128
To start the loco a Forward - Stop - Reverse switch has been fitted inside the coal bunker - 7 August 2007
To start the loco a Forward - Stop - Reverse switch has been fitted inside the coal bunker - 7 August 2007
1865x1655
Bench testing the smoke unit which was taken from a large toy locomotive costing £4.99 - 7 August 2007
Bench testing the smoke unit which was taken from a large toy locomotive costing £4.99 - 7 August 2007
1235x1455
Outside testing of the smoke unit - There is a small centrifugal fan fitted under the footplate which forces air through the unit and out of the chimney - 7 August 2007
Outside testing of the smoke unit - There is a small centrifugal fan fitted under the footplate which forces air through the unit and out of the chimney - 7 August 2007
2832x2128
Cylinder components have been made up from wood and card - 18 September 2007
Cylinder components have been made up from wood and card - 18 September 2007
2084x1312
The completed cylinder is in place with the connecting rod fitted to the I P Engineering chassis' centre axle crank - 18 September 2007
The completed cylinder is in place with the connecting rod fitted to the I P Engineering chassis' centre axle crank - 18 September 2007
2264x1472
Undergoing trials on the RVLR - Detailing has yet to be added but both the smoke and sound unit are working well - 20 September 2007
Undergoing trials on the RVLR - Detailing has yet to be added but both the smoke and sound unit are working well - 20 September 2007
2110x2450
Interior of the cab back on the finished loco - 30 September 2007
Interior of the cab back on the finished loco - 30 September 2007
2035x2620
The control switch is hidden amongst MALVERN's coal - 30 September 2007
The control switch is hidden amongst MALVERN's coal - 30 September 2007
2128x2832
Finished backhead and controls - 30 September 2007
Finished backhead and controls - 30 September 2007
2125x2695
Pictured from above the detail on the tops of the tanks and boiler can be seen - 30 September 2007
Pictured from above the detail on the tops of the tanks and boiler can be seen - 30 September 2007
2540x1996
No. 13 MALVERN is now finished - 30 September 2007
No. 13 MALVERN is now finished - 30 September 2007
2832x2128
MALVERN stands outside the RVLR workshops ready for duties - 30 September 2007
MALVERN stands outside the RVLR workshops ready for duties - 30 September 2007
1835x2270