All the sheets of printed card have been given three good coats of varnish before starting construction - The Wagon sides as supplied by Locolines have had extra detailing added to them - The one has had a small central door added and the other has had a full length door - Both of the non working doors are
All the sheets of printed card have been given three good coats of varnish before starting construction - The Wagon sides as supplied by Locolines have had extra detailing added to them - The one has had a small central door added and the other has had a full length door - Both of the non working doors are "hinged" at the bottom - 7 December 2006
16 - Construction of 4 Plank Wagons from a Locolines' card kit
Rea Valley Light Railway @ fotopic.net
Index | NextThe ends have been left almost the same as supplied - they have been fitted the other way up and the lower strip of wood has been removed - 7 December 2006

Added on 7th December 2006, has been viewed 212 times
(12 this year, 4 this month, 1 this week, 1 today)